Brand:aa
Product detail:
| Model | product name | Photo | |
| HSD-9002 | 18"ORBIT FAN | ||
| Specifications | |||
| Voltage | 110V-240V | ||
| Frequency | 50Hz/60HZ | ||
| Power | 55w | ||
| Motor | 71*14mm,71*16,71*18 Diameter | ||
| Blade | 3METAL/3PP BLADE | ||
| Speed | 3speed | ||
| Speed RPM | 1:1000RPM 2:1250RPM 3:1380RPM | ||
| Regulator | have | ||
| Rotation Angle | 360 degree Oscillation | ||
| Fan plastic material | New PP | ||
| motor | full copper wire/copper mix aluminum | ||
| GRILL | 120Grill | ||
| Power Cord: | H03 2×0.5MM,Length:150cm | ||
| color choice | White/orange/blue/green/pink/grey | ||
| guarantee | one year | ||
| Packing, Loading, Delivery & Payment | |||
| G.W | 6.65Kg | ||
| N.W | 6.00Kg | ||
| Packing Unit | 2pc/box | ||
| packing method | gift box | ||
| Quantity per container | 20" (pcs) | 40"(pcs) | 40HQ (pcs) |
| 1150 | 2300 | 2700 | |
| Loading port | FOB ZHONGSHAN | ||
| Payment terms | T/T 30% deposit with balance payment against shipping docs. | ||
| Delivery time | 30 Days After Receiving Deposit | ||
| Minimum Order Quantity | 500pcs | ||
| Safety Certifications | CE ,GS,Soncap | ||
OUR FACTORY
Quality control:
1)Before the order can be confirmed finally,we would strictly check the material ,color ,dimension of the sample step by step
2)We salesman ,also as a order follower,would trace every phase of production from the beginning
3)We have a QC team ,every product would be checked by them before packed
4)We would try our best to help clients solve problems when they occurred
Perfect quality system:
We has established a complete quality assurance system. We are both ISO 9001 and CE,CB,Rohs,SAA,SASO certified .The Co. possess of excellent quality guarantee system, adopt advanced testing equipment and quality manage method.
Our attitude:
Our In the principle of Customer First, we may also adjust products according to customers'needs.
We can provides a set completely solution for your business.
suffient production capacity:
All our factory has more than 70,000 sqm,1000 workers, maximized productivity over 400000pcs ourput per month.
Payment &Shippment
1)Terms Of Payment: T/T 30% Advanced payment, the Balance before shipment or against B/L copy Or against /LC at sight
2)Time Of Loading Container: 25-30 days after receiving advanced payment
3)Port of Loading:FOB Zhongshan Port,Shenzhen Port,CIF















