Product detail:
Data Capacity
Mining area Samarinda, kutai kartanegara, paser penajam, grogot, kota bangun.
Ave prod cap/month from miner +/- 30.000 MT until 60.000 MT / total production capacity / 45 days.
Kcal 6800 reject 6500 Maximum 1 Handymax Vessel or 40.000 MT
Kcal 6500 reject 6300 Maximum 1 Handymax Vessel or 40.000 MT
Kcal 6300 reject 6100 Maximum 3 Handymax Vessel or 40.000 MT
Kcal 6000 reject 5800 Maximum 2 Handymax Vessel or 40.000 MT
Kcal 5800 reject 5600 Maximum 3 Handymax Vessel or 40.000 MT
Kcal 5500 reject 5300 Maximum 3 Handymax Vessel or 40.000 MT
Stockpile
Mining Location from stockpile +/- 5 KM, 15 KM, 35 KM, 40 KM
Stockpile to loading port +/- 2 KM until 11 KM.
Name of port loading NRC, Muara Rico, Jongkang, Loa Buah and paser mayang river.
Name of anchorage loading Muara jawa, samarinda & Teluk Balikpapan, Balikpapan

















