Brand:aa
Product detail:
Seal good JZC Less water consumption scrap tyre pyrolysis to oil machine
The raw materials
waste tire,waste plastic,waste rubber
The out put product
the crude oil
the carbon black
the steel wire
Oil yield of different raw materials
PE | 95% |
PP | 90% |
PS | 90% |
ABS | 40% |
Leftovers of paper | Wet 15-20%, dry 60% |
Different mode about scrap tyre pyrolysis equipment
Model (diameter*length) (mm) | 2200*6000 |
2200*6600 | |
2600*6000 | |
2600*6600 | |
Boiler plate | Q245R/Q345R |
Thickness | 12/14/16/18mm |
Condensers | S-cooling pipe |
Vertical condenser | |
Horizontal condenser | |
Slagging system | Automatic sludge discharge |
Loading tyre
You can load the tires as a whole.If you put the whole tires.
Our oval-shaped feeding door is Length1400mm*Width800mm or Length1200mm*Width800mm.
Actually you can put the entire tyre into the reactor.
The whole raw materials will occupy 7percent of the reactor because of the inter-space between the waste tires.
The loading system also has new design.
Fuel Oil Parameters
NO. | Project | Car Tire Oil | Truck Tire Oil | Plastic Oil |
1 | Water content | 3%~5% | 3%~5% | 3%~5% |
2 | Sulfur content | 0.01% | 0.01% | / |
3 | Density(g/ml) | 0.88 | 0.84 | 0.84~0.86 |
4 | Cetane No. | 45 | 40 | / |
5 | Combustion value | 10500 | 9500 | 9500 |
6 | Asphalt | 0.5% | 0.5% | / |
7 | Ash | 1% | 1% | ≈0.8% |
8 | Impurity | 1%~3% | 1%-3% | / |
9 | Solidifying point | -100C | -50C | +100C |
10 | Flash point | 500C | 300C | 300C |
11 | Viscosity(mm2/s) | 5 | 6 | 8 |
Safety:
1. With an auto welding machine for the reactor, it can not only greatly improve working efficiency but also guarantee the quality of welding seam, thus avoid explosion caused by gas leak.
2. Vacuum system will prevent oil gas from going back to reactor and causing accident.
3. Professional thermometer, pressure gauge and safety valve.
4.It is dangerous to burn exhaust gas(C1 to C4) without any safety measures. In our process, it is transferred first through the safety device and a safety burning air muzzle. Before burning, we should ensure the safety of production.
Environment friendly:
1.Well water dedusting system can avoid black smoke.
2.The exhaust gas will be recycled for heating reactor, no gas pollution
3.Every junction of the reactor is in good sealing situation with professional sealing material.
Long service life:
1.Material: Q245R special steel plate ,thickness 14mm.
2. Welding: Automatic welding machine with heating treatment
3. The service life of the reactor will be 8 -10 years
Equipment Power
Name | Power |
Reactor motor/Reducer motor | 3 KW/4kw |
Draft fan | 4 KW |
Blower*3 | 250 W*3 |
Cooling tower | 3kw |
This chart is according to our home electrical connection.
So we will produce the machine according to your country electrical connection.
the water consumption
Our equipment includes the cooling power.The water consumption is 2%.If in winter, it will be 0.5~0.1%.
If you use the recycle,it will need the more water.
Note
MOQ:1set
Payment term:
30% T/T in advance, the balance paid before shipment
Delivery time
We can guarantee the delivery time.You will delivery time after your payment.
The delivery time is 20~30 working days















Legal status confirmed








