Daily Handling capacity JZC Container or Frame packing plastic recycling line

Click for original picture
Fob Price: 45000.00 USD/ 
MOQ: 1  
Payment Terms: delivery withindays since payment
Location: China
  Ms. Sarah Hu    Contact Now 询价
Not exactly what you want? Post a quick Buying Request !
 
 
Product Detail

Brand:aa

Product detail:

Daily Handling capacity JZC Container or Frame packing plastic recycling line  

The  raw materials

waste tire,waste plastic,waste rubber

The out put product

the crude oil

the carbon black

the steel wire

Flow chart about oil extraction equipment


Fuel  Consumption (PER BATCH)

Fuel

Wood 

Coal 

Natural Gas

Crude Oil

Consumption

400KG

200KG

75-85KG

100KG

High oil yield

Raw Material

Oil Output

Weaves & Handbags

≈60%

Soles

Sports shoes soles 

27%-33%

 

Black rubber soles

≈35%

 

Gum-rubber outsole

≈45%

Tyre

Steel tyre

40%-45%

 

Nylon tyre

≈40%

 

Tyres of bikes etc.

≈35%

  Different mode about scrap tyre pyrolysis equipment

Model

(diameter*length) (mm)

2200*6000

2200*6600

2600*6000

2600*6600

Boiler plate

Q245R/Q345R

Thickness

12/14/16/18mm

Condensers

S-cooling pipe

Vertical condenser

Horizontal condenser

Slagging system

Automatic sludge discharge

 Loading tyre

You can  load the tires as a whole.If you put the whole tires.

Our oval-shaped feeding door is Length1400mm*Width800mm or Length1200mm*Width800mm.

Actually you can put the entire tyre into the reactor.

The whole raw materials will occupy 7percent of the reactor because of the inter-space between the waste tires.

The loading system also has new design.

Disposing Carbon black


 

After the process,the carbon black will be put out through the slagging door automatically.The slagging door is beside the feeding door.In the end,you can get the crude carbon black with 30—35mesh. The carbon black can be used as the raw materials of the brick .It is also can  fuel directly.

 

We cooperate with the other company.So We can support the machine.

 

If you use Micro-powder Milling Machine,you can get the different mesh.

 

Mesh

Use

Sale Price(RMB)

30~35

Fuel,Making bricks

600/ton

300~400

Cable,Renewable rubber wheel,Light industry

 

1500~2000/ton

500~800

Rubber,Carbon electrode,Civilian, public use

2000/ton

 

 

 

Exhaust gas

You need use the coal or wood  as the materials.When the whole processing,the burning fuel will produce exhaust gas.

After the reactor running 3hours,you can use the waste Gas.

You can recycle the gas.The gas can be uesed as the burning materials.

Maybe You can not store the gas.

 

Security: 

 

a:  Adopting automatic submerged-arc welding technology

 

b:  All of the weldings will be detected by the ultrasonic nondestructive testing method to ensure the welding quality and  the welding shape.

 

c:Adopting  manufacture process controlling system on the quality, every manufacture process, manufacture date,  operators, etc. 

 

d:Equipped with antiexplosion device, safety valves, emergency valves, pressure and temperature meters, vacuum pump,  as well as the alarming system

 

Environmental-friendly: 

 

a:  Emission Standard: Adopting special gas scrubbers to remove acid gas and dust from smoke

 

b: Smell during operation: Fully enclosed during the operation

 

c: Water pollution: No pollution at all.

 

d:  Solid pollution: the solid after pyrolysis is the crude carbon black and steel wires which can be 

 

deep-processed or sold directly with its value

 

Energy conservation and low cost on operation: special covers of the reactors and chambers can  keep hot during the heating in good efficiency as well as the direct heating system to save energy and cost

 

 

Long life

hot-blast stove is long life,but not energy-saving,its consumption of energy is much greater than the repair costs of furnace.direct fired reactor is energysaving but short life.it is a contradiction.we resolved this conflict by thickening steel plate reactor of fire approach part which oxidized extremely,so we generally use the 14mm,16mm,18mm,20mm thickness of steel plate,or12mm stainless steel plate,other slow oxidation parts use 12mm thickness plate(20G),not noly energy,but long life.

Note

MOQ:1set

Payment term:

30% T/T in advance, the balance paid before shipment

Delivery time

We can guarantee the delivery time.You will delivery time after your payment.

The delivery time is 20~30 working days

 Deliver our machine

 

 

 
more..Other products from this supplier

[ ProductsSearch ]  [ [ Print ]  [ Close ]


Copyright © 2004 ChinaAseanTrade.com All rights reserved
中国-东盟自由贸易网版权所有@2004 沪lCP证05013507号

沪公网安备 31010102002066号