Publish infomationPost Info: Home » Products » Home Appliances » Water Heaters »

Hot Water Heat Pump 11kw Split System-Air To Water air conditioner 11~35kw

Click for original picture
Fob Price: 3000.00 USD/ 
MOQ: 1  
Payment Terms: delivery withindays since payment
Location: China
contact supplier
Not exactly what you want? Post a quick Buying Request !
 
 
Product Detail

Brand:aa

Product detail:

  Air Source Heat Pump 

 

Specification Heat Pump
TECHNICAL DATADAO-11HASDAO-14HASDAO-16HAS/3DAO-22AS/3DAO-35AS/3
HeatingNominal capacitykW11.5213.7316.0222.135.6
Power inputkW3.253.384.015.198.32
COPW/W3.554.064.004.264.28
CoolingNominal capacitykW10.2913.0114.7421.324.5
Power inputkW3.854.164.986.387.18
EERW/W2.673.132.963.343.41
DHWNominal capacitykW10.0612.5815.2120.633.4
Power inputkW3.954.054.886.19.88
COPW/W2.553.113.123.363.38
Power supplyV/Ph/Hz220-240/1/50380-415/3/50380/3/50380/3/50
Max. leaving water temperature (without using backup heater)ºC58
Refrigerant typeR410A
CompressorType RotarySrcoll
Brand SANYODAIKINDAIKINDAIKINDAIKIN
Dimensions (Net)Indoor unit mmmm1047x508x4061570x756x550
(HeightxWidthxDepth)
Outdoor unit mmmm960x990x360960x990x3601225x950x360850x820x10351210x900x1140
(HeightxWidthxDepth)
Dimensions (Packing)Indoor unit mmmm1120x585x4701750x956x750
(HeightxWidthxDepth)
Outdoor unit mmmm1100x1105x4201100x1105x4201380x1045x4551010x1010x11951425x1220x1362
(HeightxWidthxDepth)
Net weightIndoor unitkg676869102
Outdoor unitkg9598113180287
Gross weightIndoor unitkg717273112
Outdoor unitkg103106122200293
Noise levelIndoor unitdB(A)3132
Outdoor unitdB(A)515455
container loading20'  GP34 (uints)34 (uints)27 (uints)10 (uints)8 (uints)
40'  GP72 (uints)72 (uints)57 (uints)22(uints)16 (uints)
40'  HQ 72 (uints)72 (uints)57 (uints)44(uints)32 uints)

 

 

 

 

PROCESS of HEAT PUMP

1. Base plates go online

2. Install compressors, condensers and evaporators

3. Assemble and weld copper pipes

4. Recharged with Nitrogen

5. Water-inspection

6. Discharge Nitrogen

7. Vacuum air-removed

8. Add refrigerant

9. Halogen inspection

10. Fix fan component

11. Install electrical control

12. Security checks

13. Run commodity inspection

14. Stick nameplate and connection diagram

15. Document attached

16. Final inspection

17. Packing

18. Tape-out

 
more..Other products from this supplier

[ ProductsSearch ]  [ [ Print ]  [ Close ]


Copyright © 2004 ChinaAseanTrade.com All rights reserved
中国-东盟自由贸易网版权所有@2004 沪lCP证05013507号

沪公网安备 31010102002066号