High precision custom engineering based CNC part
We are just a factory in Wuxi, China, maufacturing of various kinds of precision parts , precision cold stamping mold, plastic injection mold, and also undertaking the production of related tooling clamps. The products are widely applied in electronics, semiconductor, automobile parts and other industries.
Well, you could look through our website:
www.wuxixinyi.com
www.wxxinyi.en.alibaba.com
And you will found some information, may be some help to what you like.
Quality control
1.We have self-governed inspection Dept.
2.All our QC have more than 5 years detection experience
3.Guarantee each parts have inspected before shipping
4.Advanced measurement equipment
Advantage
1.ODM&OEM
2.Import materials (from Japan,Germany,Sweden.USA)
3.Precision machined parts general tolerance 0.005mm-0.002mm
4.Accuracy for grinding:0.001mm
5.Accuracy for EDM : 0.002mm
6.Angle clearance:R0.03mm
Item | High precision custom engineering based CNC part | |
Material | Steel ,Stainless steel, Iron ,Aluminum, Brass and etc | |
Material standard | DIN ,ASTM, JIS, BS,NF,GB and so on | |
Tolerance | +/-0.005 or as per customer’s drawings. | |
Surface roughness | Strictly according to customer specifications | |
Surface treatment | Polishing,galvanized, electroplating, spraying, and painting and so on. | |
Main process | Machining,turning,milling,drilling,grinding,boring,stamping,threading, tamping and etc. | |
Production equipment | Instrument lathe, CNC lathes machine , CNC milling machine , Milling machine , Grinding machine , Tapping machine , Thread rolling machine , Drilling machine, Stamping machine and etc. | |
Quantity control | We have a stringent quality check at every level i.e. In-coming, in-process and the out going state, thereby reaching rejection and maintaining high quality as per our quality plans. | |
R&D | We have profession engineers and technical workers who are specialized in develop new products. At least 60 of new parts are developed according to customer drawings. | |
Supply chain process | PPAP | |
Payment terms | T/T 35% as the deposit, the balance 65% before shipment. | |
Samples delivery time | In common 7 - 14days | |
The production time | After getting the deposit. | |
Packing | According to the contract. |