1. China,Singapure,and TNB Malaysia.
2. PT. PLTU Paiton, Premthy Energy Ltd,
3. Global Business Power Corporation, Philipine,
========================================
OPERATION
Site Office:
Komplek perumahaan Citra No 24
Sunagi danau – Tanah Bumbu
South Kalimantan, Indonesia
============================================
MINING PROJECT / SITE LOCATION
I. Asam –asam, Kintap,
II. Sungai danau.
III. Batulicin, Serongga and
IV. Binuang, South Kalimantan - Indonesia
============================================
LICENSE BACKGROUND
The first company before, is PT. SAL PRIMA COAL was establish on February 01, 2005 and now have been new name company, the name is PT. SAL PRIMA COAL
Akta Pendirian Perusahaan
1. Notaris : C-1858 . HT . 03 . 01 – TH . 2002
2. SK Mentri Kehakiman : AHU – 09791 . AH . 01 .01 Tahun 2010
3. SIUP : 510 / 3253 / BP2T / 2011
4. TDP : 430 / BH .16 .11 / 1 / 2011
5. SKTU : 506 / SITU
6. No. NPWP : 03.094.037.3 – 732.000
With core business of mining & coal trading with affiliation to coal concession owner at South Kalimantan as coal mining project under license scheme of Kuasa Pertambangan (Coal Concession) as domestic investment which concession was signed on 2005 – 2011 under rules of local government (Bupati) as chief of district area.
STOCKPILE LOCATION AND CAPACITY
Stockpile at CENKO Pandansari, Kintap, Tanah Laut district.
Stockpile at PT.KGS Sungai Danau district.
Stockpile Kodeko at Batulicin District.
Stockpile Power Citi at Batulicin District.
Stockpile at Pulorida Quarindo Serongga district.
Stockpile at KM 94 Binuang (CPB) and Loading Port at Sungai Putting Binuang district.
CRUSHING PLAN & CAPACITY
The three crushing plan at KKP CENKO stockpile is 300 mt per hour along or equal 300.000 mt per month. The capacity of the stockpile is 300.000 mt consist of 100.000 mt ROM (Run Of Mining) and 200.000 mt of the crushed coal.
The crushing plan at PT. KGS stockpile is 200 mt per hour along or equal 120.000 mt per month. The capacity of the stockpile is 200.000 mt consist of 50.000 mt ROM and 150.000 mt of the crushed coal.
The two crushing plan at Kodeko stockpile and Power City is 350 mt ton per hour along or equal 350.000 mt per month. They have two jetty and the capacity of the stockpile is 350.000 mt
consist of 100.000 mt ROM (Run Of Mining) and 250.000 mt of the crushed coal.
The crushing plan at Power Citi is 500 mt per hour along or equal 250.000 mt ton per month. They have 1 jetty and the capacity of the stockpile is 100.000 mt consist of 40.000 mt ROM and 60.000 mt of the crushed coal.
The crushing plan at Plorida Quarindo stockpile is 200 mt per hour along or equal 120.000 mt per month. The capacity of the stockpile is 100.000 mt consist of 40.000 mt ROM and 60.000 mt of the crushed coal.
The crushing plan at KM 74 and KM 75 Sungkai (RBU Stockpile, GS Stockpile) is 300 mt per hour along or equal 300.000 mt per month. The capacity of the stockpile is 40.000 mt consist of 20.000 mt ROM and 20.000 mt of the crushed coal.
The crushing plan at KM 94 Binuang (CPB Stockpile, Andika Stockpile) is 300 mt per hour along or equal 300.000 mt per month. The capacity of the stockpile is 60.000 mt consist of 20.000 mt ROM and 40.000 mt of the crushed coal.
PORT OF LOADING & CAPACITY
Barge sailing to trans-shipment
KPP CENKO stockpile including port facility for major coal from Salaman, KM 22, KM 33, KM 37, Lokwihang, Asam –
asam, Kintap. The port has 2 jetty for each 8.000 mt barge 300 feet with conveyor system and truck closing,
PT. KGS stockpile including port facility for major coal from Mangkalapi area. The port has 2 jetty for each 8.000 mt barge 300 feet with truck loosing loading.
Kodeko Stockpile including port facility for major coal from Kodeko KM 20, Purnama, Karang Bintang, MMS, Batu Harang and Mangkal Api also. The port have two jetty for each 8.000 mt and 10.000 mt barge 300 feet and 320 feet with truck closing loading and compeyor loading.
Power Citi, (location beside of Kodeko Stockpile) including port facility for major coal from Kodeko KM 20, Purnama, Karang Bintang, MMS, Batu Harang and Mangkal Api also. The port have one jetty for 8.000 - 10.000 mt barge 300 feet and 320 feet.
feet with truck closing loading and compeyor loading.
PQ stockpile including port facility for major coal from Sehapi and Serongga area. The port has 1 jetty for 8.000 mt barge 300 feet with truck loosing loading.
Loading Port at Binuang, to be located at Sungai Putting, and the capacity is 60.000 mt. We used 2 jetty in Sungai Putting for each 8.000 mt barge 300 feet with the conveyor system. The loading rate of Jetty J is 350 mt per hours and 900 mt per hours at Jetty.
DISTANCE MINE TO CRUSHING PLAN / LOADING PORT
The distance between mine area to crushing plan / loading port (KKP CENKO) is approx 15 km - 40 km, distance between mine at Mangkalapi area to crushing plan / loading port is approx 50 km, and distance between mine at Sehapi and Serongga area to crushing plan / loading port (PQ) is approx 6 km – 20 km.
The distance between mine area to crushing plan / loading port (Kodeko & Power Citi) is approx 18 km - 60 km, distance between mine at Mangkalapi area to crushing plan / loading port is approx 68 km, and distance between mine at Batu Harang 56 Km and Purnama area to crushing plan / loading port (PQ) is approx 18 km – 20 km.
The distance between mine area to crushing plan at KM 94 Binuang (CPB Stockpile) is approx km 30 – 45 km and between CPB to loading port (Sungai Puting) is 32 km.
TRANS-SHIPMENT POINT AND CAPACITY
Muara Satui anchorage open sea is loading point for PT. KPP CENKO, and PT. DTBS port at Tanah Laut district, and Tanjung Pemancingan anchorage open sea is loading point for PT.KGS port at Sungai Danau district. Muara Taboneo anchorage open sea is loading point for Sungai Puting and Banjarmasin port.The Vessel capacity trans-shipment open sea capacity 30.000 mt to 120.000 mt.
DISTANCE TO TRANS-SHIPMENT POINT
Port to trans-shipment point is around 16 – 18 nautical
miles (knot) or around 8 – 10 hour barge 300 feet sailing.
FLOATING CRANE FACILITY
Usually the Panamax or Handymax vessel gearless equipment. Floating crane facility must be ready for load around at least 1 million mt coal per year.