0.4R /min rotating speed JZC Directly Heating Mode scrap plastic refining plant
Flow Chart
Specification about plastic pyrolysis equipment
5Ton capacity per batch can do 2.5tons,you can do 3batch in 2days,so average is 3.75ton,
8Ton capacity batch can do 4tons,you can do 3batch in 2days,so average is 6ton,
10Ton capacity batch can do 5tons,you can do 3batch in 2days,so average is 7.5ton
Model (diameter*length) (mm) | 2200*6000 | |
2200*6600 | ||
2600*6000 | ||
2600*6600 | ||
Boiler plate | Q245R/Q345R | |
Thickness | 12/14/16/18mm | |
Condensers | S-cooling pipe | |
Vertical condenser | ||
Horizontal condenser | ||
Slagging system | Automatic sludge discharge | |
approximate oil yield of different raw materials
Classification | Raw material | Oil yield |
Shoes sole | Sports shoes soles | 27%--33% |
Black rubber | 35% | |
Imitation ox-tendon soles | 45% | |
Tyre | Steel tyre | 40%--50% |
Nylon tyre | 40% | |
Bicycle tyre | 35% | |
Pulp | Rough material | 15% |
Washing material | 23--26% | |
PE material | 70% |
Carbon Black Parameters
| Inhale iodine value g/kg | 91 |
2 | ad Sorption surface area/g//g | 57 |
3 | Mesh count | 35 |
4 | Calorific value | 5000 |
5 | PH | 9.2 |
Security
our equipments have anti-blocking device and have pressure gauges,alarms,safety valves and vacuum machine.
Long life:hot-blast stove is long life,but not energy-saving,its consumption of energy is much greater than the repair costs of furnace.direct fired reactor is energysaving but short life.it is a contradiction.we resolved this conflict by thickening steel plate reactor of fire approach part which oxidized extremely,so we generally use the 14mm,16mm,18mm,20mm thickness of steel plate,or12mm stainless steel plate,other slow oxidation parts use 12mm thickness plate(20G),not noly energy,but long life.
Equipment Power
Name | Power |
Reactor motor/Reducer motor | 3 KW/4kw |
Draft fan | 4 KW |
Blower*3 | 250 W*3 |
Beautiful out-look used tyre refining equipment in Qingdao Port
NOTE:
1.Trade terms:FOB QINGDAO
2.Delivery time:12-20 days
3.MOQ: 1 set
4.Payment term:30% T/T in advance, the balance paid before shipment
5.Packing :Container or Frame